Crewe North West

This large road infrastructure project was carried out to alleviate congestion around the Leighton hospital and North West Crewe area. The project required a significant amount of highways construction detail fencing and gates, a long with various ecological barriers to help reduce the negative impact to existing wild life.

Scope of Works:

  • Over 7000m of Temporary and permanent stock proof fencing.
  • Over 7000m of post and rail fencing to HCD H3 and H15, complete with varying types of netting to help to protect livestock.
  • Ecological barriers including bat and bird ‘Hop over’ netting and badger proof fencing.
  • Ornate estate rail fencing.
  • HCD H17 and H20 steel field gates and H23 timber field gates.